Scroll to top
Healthcare and pharmaceutical

Rigshospitalet North Wing 2

In connection with the construction of the second phase of the North Wing, we at Teamtronic have supplied indoor lighting. The second phase of the building is 10,500 m2. The building includes wards, bathrooms and toilets, operating theatres, offices, underground car park and more.

In connection with the construction of the many showers and toilets, we at Teamtronic supplied our T-FRYER, which is mounted above all mirrors and sinks. The luminaire provides a pleasant light in the face and is well suited for bathroom and toilet environments.

For all corridors we have customised linear luminaires. The design is developed in such a way that the individual linear luminaires function as part of the ceiling structure. The installed linear luminaires thereby help to retain the individual ceiling tiles. In addition, the linear luminaires are designed as an endless luminaire that runs along the ceiling of the corridor areas.

Our T-LED luminaires are placed in all meeting and office spaces, operating theatres and research rooms. The luminaires are all high lumen, which is particularly suitable for hospital environments where colour rendering and light output are important.

For the stairwells, we have supplied our T-HANSI, all of which are placed on the walls along the stairs. To achieve the right lighting for the underground car park, our T-TORNADO has been installed.

  • Dato

    December 2, 2019

  • Tags

    Indoor lighting, customised, T-LED

Del reference